91精品91久久久中77777,精品无码丰满少妇12p,一级a做一级a做片性视频水里,亚洲蜜臀AV乱码久久精品蜜桃,一级毛片A女人刺激视频免费

Engineering Installation > ENGINEERING CASE

The Whole Installation of 800T/D Urea System for Hubei Huaqiang Chemical Group Co. Ltd

Time:2014-6-26


In 2007, our company for 45 days to finish the Hubei Huaqiang chemical 800T/D urea system complete installation, become "Huaqiang" company and China a "miracle"!

Installation scope:

One, equipment installation: the main plant to the six floor and prilling tower spraylayer, including operation of equipment, installation, commissioning qualified transport31 sets; static transport equipment, hoisting, installation of 63 sets, correction;

Two, equipment piping: the main plant building interior point to the six floor area of allpiping installation;

Three, carbon dioxide, water depth, hydrolysis of urea cycle, air compressor station,the main building, the urea prilling tower, Zhanqiao, packaging, in the region of the pipe rack and fire fighting water pipe installation;

Four, inspection, reconstruction;

Five, the two urea tower into a heater: include the installation of the tower, distillationtower, a tail gas absorption tower, a tower, two tower, tail gas absorption tower and other important equipment parts, all piping, equipment, valves, pipe clamp, pipe clampsupport frame, steel pipe homemade and mounting.


Hubei Huaqiang chemical construction site

The synthesis of DN1200mm tower crane

Day and night construction to ensure the project schedule

 Hoisting equipment in place

? 2014 Chengdu Zhiyuan Machine Science & Technology Co., Ltd. / TEL:028-85266505 85266063 85266506 / FAX:028-85266506-8009 / Email:cdzykj2002@163.com
ADD:D1-1301, Fund International Plaza, No. 6, Hangkong Road, Chengdu, Sichuan

91精品91久久久中77777,精品无码丰满少妇12p,一级a做一级a做片性视频水里,亚洲蜜臀AV乱码久久精品蜜桃,一级毛片A女人刺激视频免费